Big Discount 26” Industrial rubber glove-smooth finish to Pakistan Factories

Short Description:

26”length (65-67cm), black, smooth finish, seamless, no cotton lining, left/right hand, 700g/pair, cuff perimeter:61cm, double layer thickness:2.2mm. 50 pairs/case, carton size: 74*36*44cm. Net weight: 35kg/case, gross weight: 37kg/case. It can be suitable used for sand blasting cabinet operation.


Product Detail

FAQ

Product Tags

We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective. To perfect our service, we provide the products with the good quality at the reasonable price. Big Discount 26” Industrial rubber glove-smooth finish to Pakistan Factories, With the aim of "compete with good quality and develop with creativity" and the service principle of "take customers' demand as orientation", we will earnestly provide qualified products and good service for domestic and international customers.


26”length (65-67cm), black, smooth finish, seamless, no cotton lining, left/right hand, 700g/pair, cuff perimeter:61cm, double layer thickness:2.2mm. 50 pairs/case, carton size: 74*36*44cm. Net weight: 35kg/case, gross weight: 37kg/case. It can be suitable used for sand blasting cabinet operation.

  • Previous:
  • Next:
  • FAQ Content




  • http://www.Dexpan.com Save Money! Three Easy Steps for Concrete Demolition, Rock Breaking, Excavating: How to Break Rocks, Concrete Easily with Dexpan Expansive Demolition Grout. Three Easy Steps to Break Rocks and Concrete. When using Dexpan non-explosive demolition agent to demolish mass reinforced concrete or rock, there are only 3 Easy Steps to Succeed: Drill, Mix and Pour.
    1) Drilling:
    Use 1.5 inches (3.8 cm) drill bit, holes should be drilled 1 ft (30 cm) apart.
    80-90% of the depth, DO NOT go through.
    2) Mixing:
    In a bucket, combine 0.4 gallons (1.5 liters) of water with one 11 lb. (5 kg.) bag.
    Mix well to a slurry. (a drill and paddle is recommended)
    3) Filling: *Warning: Use of Dexpan in extreme hot temperatures could cause blowouts.
    Dexpan® slurry should be poured into holes within 10-15 minutes after mixing.
    Coverage: Normally one 11 lb. (5 kg.) bag can fill up to 9 lineal feet (2.5 meters).
    4) Cracking Or Cutting Time:
    Properly mixed, the cracks may appear after 2-8 hours. Allow 24 hours for best results.
    **WARNING** IMPORTANT SAFETY PRECAUTIONS and FIRST AID:
    SAFETY GOGGLES, RUBBER GLOVES and DUST-PROOF MASK is required.
    **WARNING** BLOWOUTS may occur! DO NOT look directly into filled holes.
    Do not breathe in dust. Avoid eye and skin contact. If eye or skin contact should occur, rinse it off IMMEDIATELY with plenty of water and consult doctor.
    Choose correct type of Dexpan® based on rock / concrete temperature.
    Keep Dexpan® in DRY storage. Seal box / bag after use.
    Keep out of reach of children and pets.
    How to Break Rocks and Concrete Easily with Dexpan. Rock Breaking, Concrete Cutting, Concrete Demolition Grout.



    Nano-Metre Industrial Limited was established in 1998. Which has headquarter in ShangHai and built two factories in Jiangxi and JiangSu province.

    Today Nano-Metre has become one of the Leading namufactures in safety glove field. Over 500 experienced employees,10 modern Auto-production Lines and more than 500 advanced Automatic knitting manchines in the factory guranteeed Nano-metre to produce PU gloves, Nitrile gloves and Latex gloves professionally. And export amount reaches 300,000 dozens per month.

    Derived advanced technology from all over the world continuously,We are confidence to offer new and top quality gloves to esteemed customers with professional service.

    Send your message to us:

    INQUIRY NOW
    • [cf7ic]

    Related Products

    INQUIRY NOW
    • [cf7ic]